
: MCCs e-toilet project stinks of corruption #IndiaNEWS #News Rs. 1. 52 crore paid to e-toilet unit suppliers for project worth Rs. 1. 16 croreFollowing non-maintenance, now all e-toilet units to
MCCs e-toilet project stinks of corruption #IndiaNEWS #News
Rs. 1. 52 crore paid to e-toilet unit suppliers for project worth Rs. 1. 16 croreFollowing non-maintenance, now all e-toilet units to be sent to scrapyard
Mysore/Mysuru: All the 23 e-toilets (electronic/ eco toilets) installed in Mysuru city at various points will be put to scrap as none of them are functioning. The metal and plastic pieces obtained from the e-toilets, each worth Rs. 6. 25 lakh, will be recycled at the scrapyard.
This is the fate of the ambitious project that the Mysuru City Corporation (MCC) launched with much fanfare, hoping to revolutionise public urinals. The project was floated in 2016-2017 and 23 such units were installed across the city, especially in the areas where there is more concentration of people.
The overall cost of installing these portable, eco-friendly and GPRS-enabled hygienically maintained eco-toilets is 1. 16 crore, apart from other overhead costs. The contract of the e-toilet was designed in such a way that the company that supplied the units had to maintain them for a year and later hand them over to the MCC. Users could insert Rs. 5 coin for the doors of the e-toilet to open. These e-toilets used less amount of water and there was a sensor-enabled system to conserve water and electricity usage. If the toilet was occupied, the sensor signalled the same to people waiting to get in and the doors opened only after usage.
Maintenance burdensome
After the e-toilet companies maintained the 23 units, they were handed over to the MCC. Initially, the MCC was prompt in maintaining the toilets and later it became burdensome. As a result, 10 units landed at the Vidyaranyapuram Sewage Farm. Later, the countdown began for the remaining 13 and now all of them will be sent to the scrapyard. Amidst all this, the e-toilet project has raised a stink where questions are being raised on the manner in which the hi-tech units were procured. The MCC has refused to entertain any RTI query on the project and has given only partial details on the suppliers of the units and the cost factor.
Higher procurement rates
According to RTI activist Aravind Sharma, the MCC has spent Rs. 1. 16 crore in the project but has not paid for maintenance. 18 toilet units have been procured from P. Kubendran and five have been procured from Kerala-based Eram Scientific Solution Private Limited, as per the file notings by the Executive Engineer, MCC Underground Drainage Department.
As per the file noting, though a payment for P. Kubendran was decided at Rs. 1,20,14,496, an additional amount of Rs. 3,42,823 has been paid to him for 18 units. And despite Eram Scientific Solution quoting Rs. 5,88,226 per e-toilet unit, only five were purchased from them and the MCC chose to buy from Kubendran who quoted Rs.
Latest stock market news Twitter alternate of India
0 Reactions React
More posts by @newsMNC

: LSG win toss, ask RCB to bat #IndiaNEWS Navi Mumbai: Lucknow Super Giants skipper KL Rahul won the toss and elected to bowl against Royal Challengers Bangalore in their IPL match here Tuesday. Both
0 Reactions React

: Odisha: Todays pics #IndiaNEWS #Today’s Pic A worker prepares bamboo-made articles near Nimpur playground in Cuttack A man sprinkles water on a pot containing mint-water at Kacheri Ring Road
0 Reactions React
0 Comments
Sorted by latest first Latest Oldest Best
Terms of Use Create Support ticket Your support tickets Stock Market News! © dpcheers.com2025 All Rights reserved.